Mon–Sat 7:30 – 16:00 · Closed Sunday
Premium fitted kitchen with large island, pendant lighting and roof lantern by Ultra Build Northwest

Kitchen & Bathroom Refurbishments · Manchester & Greater Manchester

Kitchen & Bathroom
Refits In Manchester —
Stripped, Specced, Finished.

Full kitchen and bathroom refurbishments delivered by one team — strip-out, first fix plumbing and electrics, plaster, tiling, install and final coat. One contract, one finish date, one number to call.

FMB Member · Fully Insured (£2m PL & EL) · Fixed Written Quotes

20+ Years Domestic Refit Experience
Gas Safe & NICEIC Trades
Fixed Written Quotes
12-Month Workmanship Guarantee

Service Overview

Kitchen & Bathroom Refurbishments
The Brief, In Plain English.

What It Is

Full kitchen and bathroom refurbishments — strip out the existing room back to substrate, re-route or upgrade plumbing and electrics, plaster, tile, install new units / suite, fit second-fix, decorate and snag. We handle the whole job under one contract, working with your chosen kitchen or bathroom supplier or recommending ours.

Who It's For

Homeowners refurbishing a tired room before sale or to actually enjoy living in; landlords upgrading rental properties between tenancies; buyers picking up a property knowing the kitchen or bathroom needs immediate work; clients who've had three trades quote separately and want one accountability line.

When You Need It

When the existing kitchen or bathroom is at end-of-life (failed worktops, blown carcasses, dropped floor tiles, mould around the bath), when reconfiguring layout would materially improve daily living, or before a sale when an updated kitchen or bathroom is the cheapest value-add available.

Why It Matters

Kitchen and bathroom refits are where most homeowners get burned by 'project managing it themselves' — six trades on six different timelines, with the tiler arriving before the plaster's set and the kitchen fitter waiting for an electrician who's on another job. A single contractor running it sequenced properly finishes in half the calendar time and costs less in the end.

What Happens If You Wait

The Cost Of
Doing Nothing.

A bad kitchen or bathroom refit is a daily reminder. You stand in front of it every morning — every cut tile, every misaligned cabinet, every dripping seal — and it stays exactly that way until you spend the money a second time.

Risks Of Ignoring It

  • Leaks behind tiles and units — slow water damage to joists and ceilings below, often discovered only when the ceiling stains.
  • Worktop seams that fail — silicone breaks down, water gets between MDF and laminate, swelling and de-bonding follow.
  • Tile substrate failure — tiles laid on inadequate backing board, cracking grout, popped tiles within 18 months.
  • Electrical non-compliance in a bathroom — Zone 1/2 wiring done wrong, no RCD protection, NICEIC certificate can't be issued.
  • Inadequate extraction — moisture builds up, paint blisters, mould in the corner that no amount of bleach kills.

Common Mistakes Customers Make

  • ×Buying the kitchen first, then trying to make the room fit it — every dimension fight ends with packers behind cabinets.
  • ×Hiring on lowest quote without checking insurance, qualifications and recent jobs.
  • ×Cheap tile adhesive and grout to save £80 on a £6,000 bathroom — the failure point of the whole job.
  • ×Skipping the first-fix walk-through before plastering — wires and pipes in the wrong place forever.

Our Process

First Call To
Final Sign-Off.

01

Design & Specification

Measured survey, discussion of layout, units, suite, tiles, lighting and worktop. Honest view of what fits, what won't and what costs more than it's worth.

02

Fixed Written Quote

Itemised quote against the spec — labour, materials, PC sums for units / tiles / sanitaryware where you're choosing later. Programme attached.

03

Strip-Out & First Fix

Old kitchen / bathroom out, walls and floor prepped, first-fix plumbing and electrics to NICEIC standards, plaster and substrate ready.

04

Tile, Install & Second Fix

Tile to substrate, kitchen carcasses level, worktops templated and fitted, sanitaryware installed, taps and electrics certified.

05

Snag, Clean & Handover

Silicone done last, sealants cured, snag list walked through with you, sign-off and certification (Gas Safe, NICEIC) issued. 12-month workmanship guarantee.

Credentials

What Stands
Behind The Work.

Fully Insured

£2m public liability and £2m employers' liability cover.

FMB Members

Federation of Master Builders — verified profile.

Structural Work In-House

Carried out by Ultra Build's own team — not subcontracted out.

Garden & External Works

Handled in-house alongside the main build.

NAPIT-Registered Electricians

Electrical work carried out by our NAPIT-registered specialist subcontractors, with certification on completion.

Gas Safe-Registered Engineers

Gas work carried out by our Gas Safe-registered specialist subcontractors, with certification on completion.

The Team

Around 7 full-time staff, and 20+ including long-standing subcontractors we've worked with for 5+ years.

Why It's Worth It

What You
Actually Get.

One Team, One Programme

No managing trades yourself. We sequence strip-out, first fix, plaster, tile, install and second fix on one calendar — finish date set, finish date hit.

Watertight Substrate

Tile backer boards, tanking around showers, properly sealed cement boards under wet-area floors — no leaks, no failed grout in year two.

Certified Trades

Gas Safe registered for any boiler / gas hob moves, NICEIC for electrics, with certificates issued on completion for your records and future sale.

Worktops Templated Properly

Stone and quartz worktops templated by the fabricator after carcasses are level, cut once, fitted with seamless joints. No on-site recutting.

Real Extraction

Bathroom fans on humidistat and ducted to outside, not into the loft. Kitchen extractors recirculating or vented per the cooker manufacturer's spec.

Clean Daily Site

Dust sheets, daily clear-down, skip on site for waste. You can keep living in the house through a kitchen refit — we keep one running water source and the worst of the dust contained.

Workmanship Guarantee

Written Into
The Contract.

Every Ultra Build Northwest contract carries a workmanship guarantee in writing. It covers defects with the structural build and plumbing issues such as faulty fittings — not just a verbal promise.

Documented at handover

10

Years

On Roofs

2

Years

On Extensions

Up To

5

Years

On Internal Renovation Defects

In Detail

Kitchen & Bathroom Refurbishments
Every Variation Covered.

Materials, methods and the situations each variation applies to — so you know what you're buying before you buy it.

Working across

Manchester · Cheshire · Oldham · Salford · Stockport · Alderley Edge · Altrincham & Hale

Full Service Area Map

Full Kitchen Refits

Strip-out of existing kitchen, removal of old plaster where needed, first-fix electrics for cooker, hob, oven, dishwasher, washing machine, ring main and lighting, plumbing for sink, dishwasher and washing machine, plaster, tiling, kitchen install (from any supplier — Howdens, Wren, Magnet, DIY-fitted or bespoke), worktop fit, splashback, second-fix electrics with NICEIC cert, plinths and trim, paint.

Full Bathroom Refits

Strip-out to substrate, removal of old flooring, first-fix plumbing for bath, basin, WC, shower, towel rail; first-fix electrics for shaver point, mirror lighting, fan and ceiling lights to Zone-rated standards; tanking around the shower area, cement board to walls and floor in wet zones, tile, install suite, second-fix taps and shower, silicone done last.

Wet Rooms & Walk-In Showers

Slope-formed floor with tanking membrane and bonded drain, tile-over-tray or fully tiled. We don't recommend a wet-room build on suspended timber floors without serious substrate preparation — we'll tell you honestly before quoting.

Boiler Moves, Knock-Throughs & Layout Changes

Moving a boiler to free up cupboard space, knocking through to combine kitchen and dining room (with structural calc and beam where load-bearing), reconfiguring a bathroom around a new walk-in shower instead of a bath. Coordinated with structural and Gas Safe sign-off.

Media Walls & Feature Joinery

Bespoke media walls with recessed TV, electric fire and concealed cabling — built from MDF on timber stud, plaster-finished and decorated to match the room. We do this in living rooms during refurbishment runs.

Residential vs Commercial

Kitchen and bathroom work is overwhelmingly residential. Commercial kitchen and washroom installs (offices, salons, cafés) follow the same trade sequencing but with commercial-grade fittings and gas/electrical certs — see commercial building works.

Questions

Straight
Answers.

Cost, timeline, guarantees, lifespan, emergency availability — the questions everyone asks, answered before you call.

Ask Yours

How much does a kitchen refit cost in Manchester?

+

2026 Greater Manchester pricing: standard kitchen refit £8,000–£15,000 (labour, materials, decoration — units excluded); mid-range with new units, quartz worktop, tile and appliances £18,000–£32,000; high-end bespoke £35,000+. Fixed itemised quote with PC sums for the items you're choosing yourself.

How much does a bathroom refit cost in Manchester?

+

2026 pricing: standard bathroom refit £6,500–£12,000 (labour, tiling, plumbing, decoration — suite excluded); mid-range with new suite, walk-in shower and quality tile £12,000–£20,000; high-end / wet room £20,000+. Fixed itemised quote.

How long does a kitchen or bathroom refit take?

+

Kitchen: 3–5 weeks from strip-out to handover. Bathroom: 2–3 weeks. Programmed week-by-week with the contract — finish date confirmed before works begin.

Can I supply my own kitchen, sanitaryware or tiles?

+

Yes — we work with any supplier (Howdens, Wren, Magnet, Wickes, B&Q, online suppliers, bespoke makers). We can also supply at trade if you'd rather we handled procurement. PC sums in the quote either way.

Can I stay in the house during a kitchen refit?

+

Yes, with caveats — one week of no kitchen sink (we set up a temporary wash point), the cooker offline when the gas / electric is being re-fitted (typically 2–3 days). Most clients live through it.

Are your trades qualified for gas and electrics?

+

Yes — Gas Safe registered for any gas works, NICEIC qualified for electrics. Certificates issued on completion.

Do you guarantee the work?

+

Yes — 12-month workmanship guarantee from handover. Material warranties on units, sanitaryware, worktops and appliances pass through from the manufacturer.

What if I find a problem after handover?

+

Call us — we come back inside the 12-month defects period and resolve at no cost. Outside that, we honour material warranties and quote any repair work fairly against the original install.

Can you reconfigure the layout, not just refit?

+

Yes — moving sinks, moving the cooker, swapping bath for walk-in shower, combining kitchen and dining room with a beam. Structural calcs and Building Regs handled where needed.

Do you cover all of Greater Manchester?

+

Yes — Manchester, Salford, Stockport, Oldham and Cheshire. See service areas.

Front elevation of a completed white-rendered detached house with new anthracite door and roof by Ultra Build Northwest

Next Step

Get The Kitchen Or Bathroom You'll Actually Use.

Free site survey across Greater Manchester, fixed written quote — no obligation. FMB member, fully insured with £2m public liability and £2m employers' liability, Manchester-based.

Fully Insured · £2m PL & EL Manchester Based FMB Member
Call NowGet a Free Quote